In August 2018, Bridge No. H-0155 on Glen Cove Road over Peddler Run was damaged during flooding from a storm and then partially collapsed during an attempt to perform scour repairs. Wallace Montgomery was tasked with designing a new bridge for Maryland legal loads, including an HL-93 design loading, and in accordance with both AASHTO and Harford County design criteria.